Customer

ABB (Presently Hitachi Energy), Bangalore

End Customer

SAIL - Bokaro Steel Plant – Hot Strip Mill (HSM) & continuous Casting Plant (CCP)

Work Executed

Inspection of Electrical & Mech Eqpt supplied by various suppliers pan India which enabled successful commission of the project at BSL on Time. Duration two years


Customer

L&T – Mumbai & Avasarala

End Customer

Nuclear Power Corp of India (NPCIL)
2X220 MW Madras-Units I & II,
2X220 MW Narora – Units I & II
And
1X220 MW Kakrapar Unit-I

Work Executed

Enmass Coolant Channel Replacement during refurbishing of the Nuclear Reactors; Work involved from unpacking tubes, cutting to size, mock-up assembly & supervision during assembly & testing in a Radioactive environment.
Duration 10 to 14 months / Unit deploying 80 to 120 Engineers at each Site;


Customer

Hinduja National Power Corp Ltd (HNPCL) near Vishakapatnam

End Customer

Hinduja National Power Corp Ltd (HNPCL) near Vishakapatnam

Work Executed

2 x 520 MW TPP; Inspection of BTG & BOP Equipment at various BHEL units & sub suppliers pan India, enabling to commission the TPP successfully on time;
Duration Three years; Project Management & FQA services rendered at HNPCL site


Customer

Fichtner Consulting Engineers

End Customer

Karnataka Power Corporation Ltd (KPCL); First 1 x 500 MW Bellary Thermal Power Station

Work Executed

Inspection of BTG & BOP / Equipment at various BHEL units & sub suppliers pan India which enabled KPCL to commission the TPP successfully on time;
In addition, Field Quality Assurance (FQA) service rendered at BTPS site by on behalf of KPCL Duration three years;


Customer

L&T, Nuclear Business Group, Powai-Mumbai & Hazira.

End Customer

Bharatiya Nabhikiya Vidyut Nigam Ltd (BHAVINI), Kalpakkam Ministry of Atomic Energy, Govt of India

Nuclear Power Corp of India (NPCIL) Ball Screw Assemblies for Nuclear Reactivity Mechanism required at various Nuclear Power Units

Work Executed

1 x 500 MW Prototype Fast Breeder Reactor (PFBR); QA / QC / Supervision Services from Raw Material, through Material preparation, Fabrication, NDT, Pneumatic / Hydro Pressure Testing & Surface Treatment; Five Sodium & three Argon Tanks dia 8m x ht 8mtr; Sodium tanks provided with outer surface thermal insulation for heating the Tanks;
Duration: 18 months On-site at Kalpakkam

214 sets of Ball Screw Assemblies; Services provided included QA / QC Services at MIDHANI, Hyderabad during manufacture of Raw Material (Rods) of Special Steel over 6 months;
QA / QC / Supervision Service during manufacture at HMT, Machine Tool Division, Bangalore; Included NDT, Inspection of Balls, Nut & Ball Screw individually & on assembly including Testing prior to NPCIL final Inspection & acceptance;
Duration: Three years


Customer

L&T, Heavy Engg Division, Mumbai

End Customer

ISAC / ISRO Solar Array Deployment & Reflector Deployment Mechanism Components

Work Executed

QA / QC Services provided during the manufacture of over 1000 small & medium sized components for the Mechanisms; 100% check was ensured after clearance by GTTC, Bangalore including PMI on finished components to ensure material integrity;
Duration: On-going